₹32 Cr Brownfield Plant Expansion Term Loan & Capex LC Line in Taloja MIDC
An export-oriented specialty chemical manufacturer in Taloja MIDC undertaking a ₹33.50 crore brownfield capacity expansion needed ₹24.00 crore in project term debt and ₹8.00 crore in incremental working capital.
Published: 26 October 2026
Deal Tombstone #BC-2026-06Project Funding
Sanctioned
₹32.00 Cr
Location
Taloja MIDC (Navi Mumbai / Raigad)
Lender Category
PSU Bank + Private Bank Multiple Banking
Pricing / Rate
9.35% p.a. (Term Loan) · 1.25% (Capex LC)
Tenor & Moratorium
84 Months (incl. 12-Mo Moratorium)
Key Coverage / Ratio
1.64x Average DSCR · 28% Promoter Equity
1. Borrower profile & initial credit bottleneck
The company was importing ₹6.00 crore of glass-lined reactors and automation systems from Germany on 180-day usance Letter of Credit (LC) terms, which the lead bank initially refused to carve out as a sub-limit of the term loan.
MIDC's Tripartite Agreement and Consent to Establish (MPCB Red Category) had pending condition precedents that delayed mortgage perfection.
Using equal monthly EMI during the first 6 months of commercial trial runs depressed Year-2 DSCR to 1.14x.
2. How the file and cash-flow waterfall were structured
Prepared a comprehensive DPR and CMA package incorporating a ₹6.00 crore Capex Import LC sub-limit within the ₹24.00 crore Term Loan (converting into term debt on LC maturity after machinery installation).
Coordinated the MIDC Regional Officer mortgage permission and Tripartite Agreement alongside MPCB Consent to Establish milestones.
Structured stepped quarterly principal instalments after a 12-month moratorium, achieving an average DSCR of 1.64x and minimum DSCR of 1.32x at 9.35% p.a.
3. Before vs. after sanction comparison
Comparison of initial position vs. final sanctioned terms (BC-2026-06)
Credit Metric
Initial Position / Bottleneck
Structured Sanction
Total Sanctioned Facility
₹20.00 Cr plain Term Loan offer
₹32.00 Cr (₹24 Cr Term Loan with ₹6 Cr LC + ₹8 Cr WC)